•Upstream industry chain includes mainly about the construction, operation, management of receiving terminal, LNG importation via LNG Carrier and LNG ISO tanks.
•Long term business plan: CNGC plans to build one LNG receiving terminal as well as corresponding facilities. The 300 MTPA LNG Terminal will be realized through two phases, by the first 1 phase, a 220,000 m3 storage tank will be built and 150 MTPA will be achieved. By 2030, the total 2 phases with 300 MTPA will be completed.
       —— 接收站建设投运之前,主要以罐箱形式,通过海运及陆运多渠道进口天然气
       —— 接收站建设投运之后,主要以LNG专船进口天然气